Answer Posted / gurunath khavanekar
Stressing is the word generelly use in post-tentioning
slab.(PT slab)
stressing means stress the strands(cables) by using the
hydrulic machine. when the concrete get required strength.
Is This Answer Correct ? | 19 Yes | 0 No |
Post New Answer View All Answers
how to calculate the steel in 500yard
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
How much of the strength of concrete comes from post- production curing?
how i get all type of short type question answer about civil engg
why top layer of block work shoud be full size if any cut block adjustable than another layer?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how can i calculate cement in brickwork
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
How to find permissible diagonal tensile stress in reinforced brick work
What is proportion of PCC Grade G?