DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / lallan
HOW TO SCOPE IN A,B,C,D CHECK? PLZ DEFINE
| Is This Answer Correct ? | 17 Yes | 4 No |
Post New Answer View All Answers
A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?
What is the efficiency during maximum power transfer?
which network topology offers the greatest level of tolerance?
What are operating procudures & Safety precautions to be observed while operating OLTC in manual mode ?
how to identify conection leads of an unknown electric motor
Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0
What will happened if the neutral of secondary of Xformer ( Star point) Note it's above KVA rated Xformer
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
Why we use ups battery and dsdb battery in thermal power plant
If a 3 phase induction motor is in off condition in the conveyor and rotor of the motor keeps moving with the conveyor than the resistance of windings of motor varies. why is it so ??
Dear Sir I am living in Jaipur Rajasthan now I did complete my b tech degree in electrical engineering in 2012 Sir how I gate certificate of competency for electrical supervisor
Sir pl provide 5 year sample paper for post junior engineer(electrical).I have currently applied for junior engineer (electrical) on RRB Ajmer
WHAT IS START TO INDUCTION MOTER IN STAR TO DELTA OF >5HP ?
how to calculate single phase motor efficiency ?
Generation of voltage for each phase are same of a turbogenerator.Although the short circuit current flow when two phase of turbogenerator are shorted(where current can't flow without potential difference),why?