why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
Answer Posted / silpa
Cube Size=150 mmX 150 MM
Area = 22.5 Sqm.
Stress = Load / Area E
Eg : 600/22.5=26.26 N/mm
Is This Answer Correct ? | 2 Yes | 10 No |
Post New Answer View All Answers
What are the phases inspections are done by local authority while construction?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
What are the different approaches in designing the floors of the service reservoirs?
At what point does a circle start losing area when being flattened?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
What is the maximum strength of cub compress strength in one cub testing
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
How to activate isometric axes in cad?
What materials were used to build the golden gate bridge?
What is a projection line?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
what motivates you to do a good job