Answer Posted / arsh
Where the span length is more than 5mts or where the span is long.
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
what is called Bulk Density of aggregate?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
what is raft foundation
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
explain five benefits of using standard terminology in the measurement process?
How to check slab shuttering level.? Or check list for slab ?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What glue is least sticky?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
to draw bm diagrams for portal frames under different loadings//
what is the mix design for M:60 with micro silica andmetakaoline?