how to calculate quantity of steel & concrete in stair case

Answer Posted / saurabh

first calculate a steel bar quantity

Is This Answer Correct ?    23 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to remove the quantity of metal 1 and metal 2 in concrete

1532


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1157


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4462


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1920


How many pyramid in egypt?

635






What does a construction cost covers and what does not?

737


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1526


A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

1773


silt%= silt volume/ silt+sand volume is this right?

1506


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

1490


what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.

1896


What is the cost difference between site mix and ready mix concrete per cubic meter

1441


A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

1715


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

1805


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?