In protection core of a C.T. why Knee pont voltage is
greater than SLV and in metering its viceversa?

Answer Posted / khaleel

the main protection core especially ps class and backup
cores have higher saturation point that metering
core.....becoz they hav to handle large fault current..that
occur in faults..so its knee point will be about 600v..

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate differential current when we testing differential relay..suppose we have 1000kw generator,630amp VCB,what value we should put /inject so that relay trip the VCB? PLLZ justify ur comment

1168


how can I calculate charging current of cable/overhead conductor? what is roll of voltage in it ?

3235


WHAT IS IEC? & WHAT IS BENEFIT TO PRODUCT FROM IEC?

1683


What is the capacitance values of 132,220,400 & 765 kV current transformer

1469


Explain in details how you would react to an unexpected incident when your supervisor or manager is not around to give instructions?

7321






HI....HOW CAN BE MESARED THE VALVE OF NEUTRAL GROUND RESISTOR WHIC IS LOCATED AT SWICHGEAR ON GENERATOR SIDE....

1614


Which type of air compressor is used now a days in the market. Keeping in mind of energy efficiency and maintenance points. Relevant documents may also be sent on mentioned email ids.

1253


what is p.s impedance measurement test in earthing transformer?

1848


placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!

1684


what is metering cum synchronizing panel and how it is used?

3996


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1565


what's the exact magnitude of current, flows through Neutral?

1550


can i use 4 number of circuit breaker as single phase manual change over switch? if yes then how plz also send ckt diagram at nazimzamurad@gmail.com

1627


what are the range of memory address in plc for L&T lx7 4A

1817


We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.

1217