Why the height of the bridges over the river are very low?
Answer Posted / bhadra
first of all, they will calculate the total catchment area
of certain river. Max. level of water will be considered
from past few years. Based upon that the height of bridge
will be designed. Another point of view is to reduce the
cost of the bridge.
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
What is pre-stressed concrete?
how to tie 10 legged stirrups
How much material will consume for following specification water tank (9*7.5*6 feet)?
Define What materials were used to build the Golden Gate Bridge?
why demand factor less then 1 ?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
what is the steel difference between np-2 and np-3 pipes and weight also
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
What is the density of most of construction materials?
What is structural frames or systems?
What is alternate bid?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How can we demolish concrete beams?