Answer Posted / aijaz hussain mohd.
M30 is a design mix and so it can be proportioned by
batching only
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
what could be the production cost of 1 cum of concrete by CP30 plant
for pretensioning which will yield first and same for post tensioning?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
How do you change a dimension value in solidsworks?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
punj loyed and sapurjl palanjl
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
how to prepare site mix design
How to calculate Volume of Wet cement concrete for a specific grade?
What is the withdrawal force of steel nails?
List out some of the common problems that architect have to tackle it?
Explain major differences between routing maintenance and major maintenance.