what is the silt(for sand) allowed persentage as per IS
CODE
B/W:
PLASTER:
CONCRETE :

Answer Posted / abhishek

10 percent

Is This Answer Correct ?    5 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is critical path method (c.p.m)?

699


Define relative co-ordinates?

693


How much cement will require for 1Rmt Skirting laying

1885


How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?

1537


What is the difference between linear dimension and aligned dimension?

634






what is meant by csr in foundation? what is sbc?what is meant by contour line?

1829


What are the methods of measurement? Describe it shortly

1782


For Wet Mix Mecadam design what is Optimum moisture content

1616


how much quantity of cement,sand and water required for 1 sq feet flooring work .

1999


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

2648


Tell me about triple point of water.

675


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2629


how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

1822


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1749


How is calculate the cube molt

1792