how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)

Answer Posted / vasanth

Skilled labour 1.5 m3, Un skilled .7m3

Is This Answer Correct ?    0 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need

2069


what is the minimum compressive strength of clay brick

1763


What is gravity flow?

685


rate analysis hiring of generator 62.5 KVA

1683


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

1975






what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1877


What is different between DI Pipe and CI pipe?

1587


in the construction of residential building what type of tank are used?where?why & what is its purpose?

1911


What is the procedure of concealed plumbing in toilets?

1894


How much is the cover for slab?

740


I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.

1675


What is Gsb tollens ?

1534


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

1646


What will you do if a portion of load bearing wall collapses under your supervision?

1527


What is meant by cad?

653