how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / vasanth
Skilled labour 1.5 m3, Un skilled .7m3
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
What is the use of extruded feature in solidsworks?
why we use 19x9x9and 20x10x10 but not other
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
What is fineness modulus ? and its sieve # ?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
explain the advantages of total stasion
Why the statue of liberty is made of copper?
How many square meter can mason layout chb per hour
What is made from large rocks, which protects the base of cliffs?
what is difference between GTS bench mark and temporary bench mark
Can we use concrete of slump cone in cube casting in which we have already measured slump?
how much of the strength comes from post-production curing
Define absolute co-ordinates?
What is componsation