how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / vasanth
Skilled labour 1.5 m3, Un skilled .7m3
Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
what is the minimum compressive strength of clay brick
What is gravity flow?
rate analysis hiring of generator 62.5 KVA
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What is different between DI Pipe and CI pipe?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
What is the procedure of concealed plumbing in toilets?
How much is the cover for slab?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
What is Gsb tollens ?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
What will you do if a portion of load bearing wall collapses under your supervision?
What is meant by cad?