What is the maximum allowable 'Silt content' in River sand
Answer Posted / prabu
maximum of 8
percent allowable
Is This Answer Correct ? | 31 Yes | 22 No |
Post New Answer View All Answers
(Project Management Topic) What are the important criteria in the successful realization of the project?
Detection of a beam & a girder areββββ
Explain what is Critical Path Method (C.P.M)?
What is 1/8 on the architect ruler denotes?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
how to identify the failure of building by expansive soils
What is the withdrawal force of steel nails?
What type of tensile strength is handling by crank in beam? Thanks.
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
Can inverted beams used in pipes during construction?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
brickwork labour rate per cum ?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
What is binding spacing of the rebars at lapping zones.