I am working as maintenance engg. in electrical but i want
to do carrier in electrical drawing.Tell me about that.
Answer Posted / bhushan bhamare
as a engg.you working for trubleshutting for ladder,any
mistake in control pannel to proper way,so whenver you have
relax time you read the control pannel drawing,ladder for
PLC,and you have make the carrier in electrical drawing so
you work as a maintance engg because its benifited for you
and get more knoeledge.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
I have a 380 KVA DG set. How can i find out 1. My Fuel Consumption per hr ? 2. Electricity produced in 1 Hr. ? 3. If load varies then how does it affect fuel consumption & electricity produced ? Please HELP !!! Really need an answer.
what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group
Can u tell me design of switch yard
give some advantages and disadvantages of combiniing the session, presentation, and application layer in the osi model into one single application layer in the internet model
What should be the amps for a MV fuses for transformer 630kVA 20(10)/0.4 kV
electrical ques
distribution is maximum done by a)radial b)network c) parallel d)b & c
what type of questions are asked and howmwny questions belong this catagory?
electromechanical relay type identification example : type=tjmh t-stants for j- m- h-
What is Primary And Secondary Injection Test of Relay and Other Electrical Devices. How IT is carried out.
Why we use circular(Stepped) cross section in transformer core?
Why only sinusoidal ac voltages are generated?why not triangular or sawtooth?
why are the maintaine power factor and how can this control and this is how work.
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?
How do i carry out or know the vector group of a Dyn1 and Dyn5 transformer