Answer Posted / k.amirthalingam
Grade slab or SLAB on grade.....
The Concrete slab resting on the graded basement(subgrade)
is slab on grade. Normally it is widely used in undustries
where the regular traffic movement is allowed.
K.Amirthalingam from Ariyalur
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Form where IS456 is adopted in 1978?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
what is the meaning of 40/20 src
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Howmuch bend to be provide for 200/600 BEEM
Gidc technical que paper
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
why is the column design?
at what pressure ply-wood is obtained by gluing wooden sheets
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
for pretensioning which will yield first and same for post tensioning?
what is the service corridor?