Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is grade slabs

Answer Posted / k.amirthalingam

Grade slab or SLAB on grade.....

The Concrete slab resting on the graded basement(subgrade)
is slab on grade. Normally it is widely used in undustries
where the regular traffic movement is allowed.

K.Amirthalingam from Ariyalur

Is This Answer Correct ?    9 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Form where IS456 is adopted in 1978?

1996


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

2242


what is the meaning of 40/20 src

6290


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

2113


Howmuch bend to be provide for 200/600 BEEM

1619


Gidc technical que paper

1788


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

2202


for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

2065


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

2139


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3055


why is the column design?

2274


at what pressure ply-wood is obtained by gluing wooden sheets

2606


Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

2015


for pretensioning which will yield first and same for post tensioning?

2274


what is the service corridor?

2400