Answer Posted / k.amirthalingam
Formwork is the temporary wooden works or steel works which
will hold the concrete when it is freshly poured. The
formwork material will be of plywood,steel sheet, normal
18mm thick wood. We say in Civil engineering as Shuttering
works.
By
Amirthalingam
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What will you do if a portion of load bearing wall collapses under your supervision?
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
what is the minimum compressive strength of clay brick
How will you Engage Labours on Site?
what is the use of beam end forces while using a staad ? wha they are show
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
Will water damage concrete?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
How much cement and sand required for 9"brick wall per square metre
what motivates you to do a good job
What does a construction cost covers and what does not?
explain what do you mean by the property development.
What is the quantity of cement in mix m20 concrete?