Explain the laying procedure and laying depth of submarine
cables under sea?
Answer Posted / abhinav
An underwater electric power cable which has a minimum
radius of curvature to which it can be bent without damage
and which can be suspended between underwater suspension
points in no greater than a predetermined length for a
desired service life is layed by first laying a flexible
steel rope along the desired underwater course and
adjusting the rope position and length so that there are no
curvatures thereof less than the minimum radius and no
lengths thereof greater than the predetermined length, and
then, the cable is layed alongside the rope so as to follow
the configuration of the rope.
burial depth can be 5 metres for 132 kv .
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For high frequency application we use which transformer?
Why field rheostat is kept in minimum position?
What are the basic component of a cro?
What is Phase to Phase clearance for 800V System Operating Voltage as per IEC61439
Batteries. What is the difference between Lead and Nickel batteries ?
What is the capacity of the Fastners 12mm?
working principle a.v.r. ?
is the value of inductance depends upon the evalue of thitha in doubly excited machine?
The SFC of an engine is 0.25 kg/kW hr. when the fuel used has a calorific value of 36000 kJ/kg. the thermal efficiency of the engine is
Electronic circuit
What are the specifications for getting approval of Substation?
how to carried out tan delta test in 11 KV alternator ?
what is the mechanical safety of DG ?
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?