Answer Posted / sibi
midil half
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
how to preaper for interview wat they asked in interview give me idea
How to find beam R/F cutting length
Volume of 25kg putty bag & 40 kg putty bag volume??
How to calculate the quantity of ingredients of M20 grade concrete?
how we check the thickness and line of ceiling plaster.
What do we mean by partial moment release ??
Who built the sears tower?
can you give me the details of rate analysis of steel and concrete?
Define What is diversion tunnel in a dam?
how calucate cement sand ratio for plstering
How much material will consume for following specification water tank (9*7.5*6 feet)?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
what is differences between ferrock and concrete ?