Answer Posted / sriram
50 X DIA OF BAR
| Is This Answer Correct ? | 25 Yes | 8 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
How to calculate canal slope curvature qty!
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
how to calculate valuation for the old building?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
Define What is unit weight of normal concrete?
What is change order request?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
construction workers how much time take one work or qty
Can we apply curing compound on ceiling (slab Bottom)
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
How is the strength of cement measured?
five requirements of infill panels for walls?
Water filter calculation formula