How many kilograms of 12 mm coarse aggregate required in
cufic feet for one cubic meter of M25 grade concrete
Answer Posted / guest
5 kg each
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
it is possiblee to produce concrete with out cracks...
Is there any course for billing available in Mumbai? If yes then please mail me the details..
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
door and window wood work calculations and different methods
what is shuttering co efficient?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
What is Curtailing of R/F