i want all model questions paper for robert bosch
Answer Posted / jan - 22
i want also answer for those questions.
Is This Answer Correct ? | 14 Yes | 3 No |
Post New Answer View All Answers
full process of gas turbin?
what is instrument philosophy
what is the procedure of O2 sensor(ABB) calibration?
Define cryogenic?
what is the difference between -24 : +24 & 0:24 and where it use?
how can leve transmetter calibate in feild .and also put cv and flow plz .....
Why MUX JB's are using only Temperature Element in Fundation field bus?
when placing a vent or drain hole on an orifice plate should you measure from the center of the bore up or down for the vent placement?
Galvanizing.
A length of steel pipe is used to carry sea water to a desalination plant. An adequate corrosion allowance must be specified and indicated in the piping specification, which affects the _________________________ of the pipe
Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =
plz send me general of ongc
what is actual drum level and compensated drum level?
How to fix back the valve actuator stem
please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826