Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?

Answer Posted / mhbkpr

We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1495


How to calculate plastering for elevated water storage tank

825


Wats the formula of eccentric footing and how was calculated from concrete qty

2567


How many feet are in 4 square yards?

728


How do you maintain water pressure?

658






Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

10828


Why should you consider yourself fit to be hired by jindal steel.

3929


Define What is made from large rocks, which protects the base of cliffs?

665


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

2541


How much material is required for constructing a 2 Lane 2Km rigid pavement road

1735


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2054


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

1589


How and where are aqueducts built?

698


Define line type?

680


sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

2006