Answer Posted / parthkumar salunke
up to plinth level it is called substructure and above
plinth level it is called superstructure.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
Exterior Joints,define
How to calculate Volume of Wet cement concrete for a specific grade?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
How to do rate analysis for concrete work including shuttering work?
What are the RISKS during the project construction?
Define What is an ice dam sock?
in 100 cft = 1350 bricks in 100 cft = ? bloks
how to take concrete quantity for precast segment for viaduct project?
Draw the cross section of a boundary wall and label its part with detailing?
Where will be the maximum bending moment in a TEE Beam?
what is the water-cement ratio of mix design while 30mpa in 7 days?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?