Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / m.haseeb yaquobi
becuase it reache more then 50% of its full strenght
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
for pretensioning which will yield first and same for post tensioning?
What is an object snap mode?
if the nitrates more than 45mg/l in water lead to disease then what is it called
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
what are the challenges of being a team leader and a supervisor?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What Are The Steps Involved In The Concreting Process, Explain?
What are the causes of building collapse?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
what is m30 in concrete tiles
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
What are your goals?
specifications of fe500 steel