Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / m.haseeb yaquobi
becuase it reache more then 50% of its full strenght
Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
How you can turn off the display for dimension in CAD?
What is specific gravity???
what is the most suitable foundation when construct a bird watching tower in a marshy land
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
Explain major difference between auto level and dumpy level?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Which is the direction for positive angle?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
How does siphoning work?
is basic cost of the material includes tax?
How to estabilish reinforcement Steel rolling margin for a building projects ?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?