Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?

Answer Posted / m.haseeb yaquobi

becuase it reache more then 50% of its full strenght

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

2041


How you can turn off the display for dimension in CAD?

641


What is specific gravity???

882


what is the most suitable foundation when construct a bird watching tower in a marshy land

1426


sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].

1686






Explain major difference between auto level and dumpy level?

748


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1010


how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

2003


Which is the direction for positive angle?

728


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2263


How does siphoning work?

827


is basic cost of the material includes tax?

1533


How to estabilish reinforcement Steel rolling margin for a building projects ?

3651


TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

1704


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1673