Which element has power dissipated in it when the source is
removed ?
Answer Posted / vivek kumar
Inductor stores energy by virtue of magnetic field around
it.So wheh it is disconnected from the source then due to
(e=-Ldi/dt) power is dissipated.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What products have you designed which have entered high volume production?
why we are using Load factor?
WE ARE PLACE A NEW 75 KW MOTOR FOR JPF.IT IS CONNECTED IN M.C.C. WHEN WE ARE STARTING M.C.C.INCOMER IS TRIPPED.THEN WE ARE CONNECTED IN P.C.C WITH A MM30 RELAY PROTECTION THEN WE ARE STARTED MOTOR WILL RUN SMOOTHLY.
what is the main function of capacitors in mccs.
Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.
what is the voltages using in movie theaters??? why ??why not other??
I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?
what is negative and zero impedance in 3 phase induction motor ??
How to select a contactor? How many types of contactors are available
What is meant by vector group
if 6 earth pit value is 1.5 ohm then what should be the number of earth pit to make the value .8 ohm
why three phase capacitor takes unbalanced current in capacitor bank?
In the Variable Voltage Variable Frequency Drive, how the Voltage and Frequency varied ? Is it varied in the Inverter part of the Drive ? Please give us supporting document if any.
what kind of technical test that i need to learn because i have an interview tomorrow.. please someone help me..
i want to learn control schedule for 11kv panel? can any one send the detailed control schedule?