What"s the brick size we use in construction?1.190x90x90
2.230x100x75 Which one "s correct?
Answer Posted / sag
190*90*90
Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
At what point does a circle start losing area when being flattened?
What is the basic difference between OPC
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
what is the meaning of degreasing of the euipment or line.
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
how to shuttering is used in slab
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
natucher of concrete &type of concrete?
What is the use of array command?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What are the benefits of rcc pipes over steel designed pipes?
Define What is unit weight of normal concrete?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)