Answer Posted /
| Is This Answer Correct ? | Yes | No |
Post New Answer View All Answers
What is the differences between a primary key and a unique key in sql server?
What are the basic functions for master, msdb, model, tempdb databases?
What is translation phase?
Is postgresql free to use?
How do you repair a hydraulic jack?
what parameters should we check to reduce the power bill
Is array part of collection framework?
You are working on a project that was proceeding well until a manufacturing glitch occurred that requires corrective action. It turns out the glitch was an unintentional enhancement to the product, and the marketing people are absolutely crazy about its potential. The corrective action is canceled, and you continue to produce the product with the newly discovered enhancement. As the project manager, you know that a change has occurred to the project scope. Which of the following is true? A. Project scope changes do not require CCB approval. B. Performance measurement baselines are affected by scope changes. C. Project scope change uses inspection to determine if change has occurred. D. Project scope change uses workarounds to correct unexpected problems with scope change.
AT THE TIME OF REDEMPTION OF DEBENTURES. WHEN THERE IS PROFIT/LOSS ON SALE OF DEBENTURES WE TRANSFER THAT AMOUNT IN PROFIT AND LOSS A/C BUT WHEN WE CANCEL OUR DEBENTURES AFTER BUYING IT FROM OPEN MARKET THE DIFFERENCE BETWEEN MARKET VALUE AND COST OF DEBENTURES TRANSFER TO "CAPITAL RESERVE ACCOUNT .. WHY SO ANY PRACTICAL ANSWER ??
what is formula for calculate thermal overload in new numiricalrelay( not in bimetal relay)?
Why your CGPA is so low?
Define conpeek()?
Can django replace javascript?
How an object is serialized in java?
Explain the Flow of remoting?