Answer Posted / mohammad abdullah
Its depends upon the design and Load, mostly in field following overlaps are use
48*D
or
50*D
Is This Answer Correct ? | 12 Yes | 5 No |
Post New Answer View All Answers
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Define the various stages of the project planning process in construction.
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
what is the 0 value in quantity surveying
How to calculate 1 brss for RCC work
Explain how you can turn off the display for dimension in CAD?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
what is escalation?how it is done?
What is the minimum size of the particles of silt soil?
Basic questions of civil engineering
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
what is smart building materials?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
Explain different types of rcc pipes.
What are the techniques to measure road difference?