why any Elelctricity board insist not to change the buren
of their metering CTs or PTs for metering purpose? as a
example elect. board not accepted that any customer change
their metering CT or PT core burden from 5VA to 15VA.. why?
Answer Posted / k.prakashchandra
The more the burden ,the less the accuracy
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the drawback of class b amplifier?
what is differant beetween overload current and phase current?
what happen if generator of micro hydro running at only a small percentage of its capacity, as a comparison, if the diesel generator that runs on only a fraction of its capacity there will be a wet stacking
Advantages of using generator circuit breaker (GCB) scheme in a power station ?
what is the reactive power what is the use of it in system
What is the general system requirement of alternator?
please send me latest & previous years question papers for IOCL Technical level questions
how line turns ratio changes in 3 phase with change in connection
why impudance relay used for medium transmission power system? why not others?
how calculate the electrical load for industry and office
Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?
What is VSCF windelectrical system?
What happened when capacitor connect series in ac circuit?
What is 100% protection of generator? Why 100% is not used but 95% is generally used?
What range of speed can you get with the armature control method of speed control of d.c. Shunt motor?