why any Elelctricity board insist not to change the buren
of their metering CTs or PTs for metering purpose? as a
example elect. board not accepted that any customer change
their metering CT or PT core burden from 5VA to 15VA.. why?

Answer Posted / k.prakashchandra

The more the burden ,the less the accuracy

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the drawback of class b amplifier?

641


what is differant beetween overload current and phase current?

1769


what happen if generator of micro hydro running at only a small percentage of its capacity, as a comparison, if the diesel generator that runs on only a fraction of its capacity there will be a wet stacking

1440


Advantages of using generator circuit breaker (GCB) scheme in a power station ?

4735


what is the reactive power what is the use of it in system

1620






What is the general system requirement of alternator?

1319


please send me latest & previous years question papers for IOCL Technical level questions

1403


how line turns ratio changes in 3 phase with change in connection

1414


why impudance relay used for medium transmission power system? why not others?

914


how calculate the electrical load for industry and office

8326


Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?

1600


What is VSCF windelectrical system?

1334


What happened when capacitor connect series in ac circuit?

962


What is 100% protection of generator? Why 100% is not used but 95% is generally used?

621


What range of speed can you get with the armature control method of speed control of d.c. Shunt motor?

626