How we calculate the spacing between the conductors in 11,33KV
lines?
Answer Posted / k.prakashchandra
40 cm minimum as per IE rules
Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
circuit diagram of trip circuit supervision relay
what are the stresses in circuit breakers ?
what is meant by rotating magnetic filed
what is the difference between transformer,converter and transducer
How we calculate DC inducation moter Amp? Sir pls give me formula......
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
hi, could someone help me to find a control design for syncronising panel .
if 2 coil of 1000W connect in series and 200 v is applied across it . then what is the total power of coil when coil have only resistive load .
in wind mill use 2100 kw asychronous generator ( induction generator ) rotor voltage : 3300,stator voltage : 690, rpm : 1511 type : MRL063E04 ' we check rotor resistance magger value found following. R-EARTH - 00 M.OHM,Y-EARTH-34 M.OHM,B-EARTH- 33M.OHM R-Y: 31 M.OHM, Y-B: 00 M.OHM,B-R :33 M.OHM HOW CAN I TAKE DECISION?pls ans. quickly
what the principle of sincroscope?how it works?when it needed?
In a voltage-controlled current source A A current booster is never used B The load is always floated C A stiff current source drives the load D The load current equals Isc
could an induction motor be used for regenerative braking in electric-train control? in this type of application would some scheme have to be devised to obtain low synchronous speeds while braking? would induction-motor drive, therefore, be suitable for passenger service?
Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???
How do you compute voltage drop and cable size over distance?
Why an ac solenoid valve attract the plunger even though we interchanges the terminal? Will the poles changes?