y we need to take 28 days strength as compressive
strength ? y cant we take 30 th day
Answer Posted / ravi
In 28 days, concrete will gain its complete strength. After 28 days, you can take the strength on any day. You will get the same result. We need the results as early as possible. 28 days the minimum time it takes for the concrete to gain its complete strength. So, we take 28 day strength.
Is This Answer Correct ? | 44 Yes | 3 No |
Post New Answer View All Answers
how to calculate the weight of concrete
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What is semirigid connections?
How we calculate the service time of buildings
what is the meaning of degreasing of the euipment or line.
Civil engineering material testing Standard results
What goals do you have in your career?
what is called the inverd level of mabhole chamber?
How is the leaning tower of pisa supported?
what is the theoritical percentage of concrete cubes testing per day?
What is the force exerted by the tacoma narrows bridge?
cement and sand required for one block of size 0.23*0.15*0.46
pls mail some more tecnical qustions at msaranya2610@gmail.com