How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?
Answer Posted / s.gopal
10 FEET =3.048m
3.048*3.048*0.010=0.093cum
sand required =0.093cum(3.28 cft)
Cement req - 1/5*1440*0.093=26.8kg
Is This Answer Correct ? | 58 Yes | 52 No |
Post New Answer View All Answers
What are the different theories of failure under static load?
For Wet Mix Mecadam design what is Optimum moisture content
IS code for Rolling Margin of steel
How many types bend used in civil reinforcing
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is command line?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
what are the proper pipes for salt water line
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
Explain the latest method to detect a crack in a building?