how much quantity of tile placing can be finished by one mason
per day?

Answer Posted / yaswanth kumar

160 to 180 Sft/mason/day

Is This Answer Correct ?    40 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the steps involved in the concreting process?

866


types of piles detail,

1815


what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?

2102


what is the minimum compressive strength of clay brick

1760


What is the difference between a wood shake and wood shingles?

697






we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?

1913


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

967


what is the most suitable foundation when construct a bird watching tower in a marshy land

1423


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2386


What is the crank length in the slab?

628


What does a construction cost covers and what does not?

737


Why should you show Client/Engineer activities clearly on the project plan?

1955


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2028


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2140


what is the method used for marking of cantilevers in hirise buildings by using theodolite

2431