Answer Posted / linu t. mathew
Management Information System.
It is for the purpose of informing quantity/values/amounts,
actually used/done, to the management every month, not to
clients and all.
Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
Can we use concrete of slump cone in cube casting in which we have already measured slump?
What is the Hardness of M-40 grade concrete, general and theoratical
How many axes do cartesian coordinate system has?
What is demising walls?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
how u design STAGING for Superstructure in BRIDGE construction?
Define What is rigging?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
Minimum concrete cover in slabs, columns, beams, foundation and other st?
how to control PQI (Project Quality Index)
what is meant by csr in foundation? what is sbc?what is meant by contour line?
water leak detection system question & answer
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Does VDF add strength to the flooring apart from preventing water ingress?