Answer Posted /

Is This Answer Correct ?    Yes No




Post New Answer   View All Answers


Please Help Members By Posting Answers For Below Questions

Hi All If any one of you wanna banking related interview preparation then contact me on pksingh1512@gmail.com. Currently i am located in Navi Mumbai-Vashi

937


How to synchronize two ms access files? I am using one Ms access file (access 2007 accdb file) in my system. the same file i have given it to another section for data entry. every day data entry is being done in that section and i am making reports in my access file. how do i synchronize both file because i need to update data entries from that system and update my new reports to that system. Plz help me how to do that? Network is not available between these systems and things can be done via storage devices only.

471


How will u integrate existing ecc6 environment into solution manager

335


What are the causes of low compression in the main engine?

367


How tax deduction at source is deducted

476


suri transmission

2362


1) Synonyms 2) Co-related Subquery 3) Different Jobs in Plsql 4) Explain Plan 5) Wrap 6) Query Optimization Technique 7) Bulk Collect 8) Types of index 9) IF primary key is created then the index created ? 10) Foreign Key 11) Exception Handling 12) Difference Between Delete and Trunc 13) Procedure Overloading 14) Grant Revoke 15) Procedure Argument types. 16) Functions. 17) Joins

137


At full load wat is the motor p.f And at no load will is the motor p.f?

574


WHAT ARE EARTH MOVING M/CS? WHAT IS BATCHING PLANT? WHAT IS HYDRAULIC JUMP? WHAT IS TIPPER (EARTH MOVING M/C)?

1132


I have transfered the goods in F-Form (i.e. from one state to another) but now the problem is when I have sold the material in the Local market say for 100+tax=100tax, some of the material got defective say 50+tax=50tax. We will have to issue F-form of how much ??? 100 or 50. Kindly send me the same to my mail address - u15326@rediffmail.com

445


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

684


Sir i am Btech Electrical 2006 i ve a 4 years exp. i want to go to australia for working please help me.

1118


My wife is on H1B Visa at US. I have applied for H4 visa and I am going there to take care of my child who is 4 years.If they ask why I am going there and what I do there what should be my reply?

854


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

412


How does DTD work?

2647