actually dia of the bar reduce asper drawing spacing also
decrease that time so how to calculate the spacing of with
respect to changed bar dia?
Answer Posted / zaheer
Spacing should be <3d
Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
The portion of a brick cut across the width is called?
Why concrete barriers have curved surface profiles?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
What is the basic difference between OPC
indian standard split spoon sampler
how do you stabilize a waterlogged area in road construction
What tor stands for in tor steel?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
How to calculate construction cost of residential building in mumbai
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What is the use of mirror command?
what is constat for brickwork