Answer Posted / santhoshselvamani
0.5 masons means
half mason charge of the day/shift
same like supervison charges
Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
why building got air crack? if it get in one particular are what is means?
How to do bbs in excel format
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Explain moment of inertia and its importance.
what is the mode of method of face bar measurement
What in bending moment, if a moment is free end of cantilever beam?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
difference between trapezoidal and pedestal footing and how the load acts on that
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
What Are The Different Type Of Slump Test Indications?
what are the types of design? which type of method is used at what type of design & why?