Answer Posted / cbsrinivas
i think the next is 71
here we have 3,6,13,26,33,66 ok
1st 3+3=6
2nd is 6+7=13
13+13=26(following same order)
26+7=33
33+33=66
so obvioisly the nxt will be 66+7=71
Is This Answer Correct ? | 4 Yes | 34 No |
Post New Answer View All Answers
how statics is different from dynamics
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
undistributed samples are obtained by
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
what is the theoritical percentage of concrete cubes testing per day?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
what is the dimensions of river sand truck trailer or trolly ?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?