IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / veera
working stress design is more conservative than limit state
method.concrete being a brittle material high factor of
safety is adopted (i.e-3).it is a stress approach,in case of
limit state partial factor of safety is used load is
factored and this a strain approach.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is the difference between natural draught cooling tower and induced draught cooling tower
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
In cement making,what is meaning of blend,fineness,density.
VAT and CST ? Which benefits for buyer ? Why benefits?
I need old MMUP exam question and answer for Civil engineering
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
What are the important hardware systems used for cad?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail