Answer Posted /

Is This Answer Correct ?    Yes No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

State the different editions of sap hana?

57


What is production data structure generated from r/3 system?

201


What is a global variable in c?

586


How do you change the text color on messenger?

279


Generation of voltage for each phase are same of a turbogenerator.Although the short circuit current flow when two phase of turbogenerator are shorted(where current can't flow without potential difference),why?

1639






what is tickets $ what low,medium,high priorite pls define time also

1718


Truck # 3 has a list price of 16000. It is acquired in exchange for a computer system that company A caries in its inventory. The computer system cost 12000 and is normally sold by company A for 15200. Pass the journal for the same.

1621


Do you know anything about DirectConnect software? Who is a vendor of the software?

1762


You are a project manager for Laurel's theater productions. Your new project is coming in over budget and requires a cost change through the cost change control system. You know all of the following are true regarding Cost Control except: A. Performance is monitored to detect variances B. Changes are reflected in the cost baseline C. Changes are monitored and reflected in the project scope D. Changes are monitored so that inappropriate changes do not get into the cost baseline

566


What is erd?

580


What is assembly used for?

499


Define What is diversion tunnel in a dam?

747


What to do if dba lost the system password?

593


What is ruby software and where and when it is usefull.

5


What is testng and how is it better than junit?

499