what"s the minimum content cement allowed in RCC?
Answer Posted / prakash kedia
for rcc minimum amount of cement according to is code
300 kg/m3 with th admixture
and the maximum amount of cement is 450 kg/m3 without the
admixture
Is This Answer Correct ? | 8 Yes | 7 No |
Post New Answer View All Answers
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
how i get all type of short type question answer about civil engg
what is the theoritical percentage of concrete cubes testing per day?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
In the roof of a pumping station explain briefly the components of a waterproofing system?
List out the potential risk factors for workers on the construction site?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
how much one carpenter can doing shuttering of slab in one day
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the types of surveying?which type of survey carrying for type of work?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.