oil sample dielectric test gives the insulation rupture
voltage at 26 kv. is this transformer safe to be operated .
The working voltage is 11 kv

Answer Posted / k.prakashchandra

40 KV is the minimum value required. You need not panic.
Measure the BDV again after 15 days. If there is drop ,oil
filtering is to be done at the earliest

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is class of SPD and dittels of all class ?

1579


what is gridrotor resistance starter

1440


What is Antipumping Function & If we have C.T how we find the Ratio ?

1524


For overhead protection we use which transformer?

1945


what are the reasons of CT circuit faulty in busbar protection scheme?

957






how to electrically make connection to ferroli GN2N?

1471


What is big transformer parts and their function ? Ty

1681


I want to make street light with solar system ... What may I do for procedure and how much of estimation for each material ... If any one knows guide me and inform this id : aravindd7@gmail.com

1348


On Which Pressure PRV is operated.

1278


Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.

2891


What is the slip speed?

663


how oti and wti connections are different from each other?

1593


What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.

2218


Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT

2122


describe the Operation of induction generators from bus bars

1812