oil sample dielectric test gives the insulation rupture
voltage at 26 kv. is this transformer safe to be operated .
The working voltage is 11 kv
Answer Posted / k.prakashchandra
40 KV is the minimum value required. You need not panic.
Measure the BDV again after 15 days. If there is drop ,oil
filtering is to be done at the earliest
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is class of SPD and dittels of all class ?
what is gridrotor resistance starter
What is Antipumping Function & If we have C.T how we find the Ratio ?
For overhead protection we use which transformer?
what are the reasons of CT circuit faulty in busbar protection scheme?
how to electrically make connection to ferroli GN2N?
What is big transformer parts and their function ? Ty
I want to make street light with solar system ... What may I do for procedure and how much of estimation for each material ... If any one knows guide me and inform this id : aravindd7@gmail.com
On Which Pressure PRV is operated.
Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.
What is the slip speed?
how oti and wti connections are different from each other?
What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
describe the Operation of induction generators from bus bars