Answer Posted / vipul
motor control center panel
| Is This Answer Correct ? | 17 Yes | 3 No |
Post New Answer View All Answers
What facility we get after CT secondary earthing and how?
What are your future plans for the company if permanently employed?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
What do you mean by dependent and independent voltage sources?
please send me latest & previous years question papers for IOCL Technical level questions
draw the full wave and half wave circuit of 3 phase system and inverter circuit used in upsĀ
Zone of protection and tripping scheme of arc protection relay.
what is the requirement regarding earthing of Single conductor with AWA
what is the AC Plant and how can do the work with parts and picture tell us 150 Tr
What are the advantages and disadvantages of closed-loop control system?
What is the power factor of an alternator at no load?
Sate maximum power transfer theorem?
How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer
How to select cable the size, what is the parameters use and what is the formulas use for this cable size calculation?
What is steady state response?