How would we calculate the no of earthing pits required
for motor /panel

Answer Posted / g. janakiraman

no off earth pits are decided by considering the total
fault current to be dissipated to the ground in case of
fault and the current that can be dissipated by each earth
pit.
normally the density of current for GI strip can be roughly
200 amps per squre cam. based on the lenght and dia of the
pipe used the no of pts can be finalised. this has to be
worked out.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Power Factor Correction Panel (Manual & Automatic)

1692


How we can defined theecopper cable size if we know the aluminium cable size?

1386


How i can decide that HVDC line is best for transmission.

1442


what is the transformer rush current?

1586


what's the requirement of Dy11d0 connection of 3 phase transformer?what's use of it?

7388






What is Fire Panel ? How it works ?

1594


what type of questions are asked and howmwny questions belong this catagory?

1718


What are the main faults of DC generators?

2367


What is 11 N1 and 12 N2 in single phase Transformer ?

1507


Can anyone tell me some hints about what type of questions are asked by the interviewer by an Electronics engineer when company is installing an IPP and wants a team of engineers?

1811


What is meant by RVT and NDR ? expansion and details of it

2469


what is working process of star delta controlling circuit ?

1410


Why electrical power generation and transmission done in 3 phase system not more than 3 phase ?

2569


what shoud be strength and weakness to impress interviewer????????

1630


sir, i am 3 years diploma course pass out candidate.what type of certificate can i got in marine service.

1453