with out excell knowledge primavera is possible or not?
Answer Posted / sachin pawar
well it is possible without primvera, knowledge of excell
will be added advantage,
you can easilly learn how to operate excell in home also.
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Which IS Code/American Code applied for coupler test of steel
Stringer How many cm goes to landind
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
How to hide dimensions in autocad?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
Slab quantity
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
Use of coping on terrace wall and in 4" wall is compulsory or not ?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Define What are the uses of Groynes?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?