Answer Posted / punit
M means mix.
30 represents 28 days compressive strengh of concrete.
Is This Answer Correct ? | 17 Yes | 0 No |
Post New Answer View All Answers
What are the advantages of cad software’s?
Explain what is Hybrid Foundation?
very simple or less time consuming formula for reinforcement calculation by moment
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What is the tallest man made structure in the world?
what is mean by c32/40s concrete class
Why the finite element method is lower bound solution?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What is alternate bid?
how to workable concrete cube test M-25 design mix
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
What is the tensile strength of marble?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25