plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / rajeeb lochan rout
If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.
Is This Answer Correct ? | 14 Yes | 10 No |
Post New Answer View All Answers
can i get hindi version of is codes based on civil engineering?
What is 1/8 on the architect ruler denotes?
why we are using stub column..? is it possible to construct steel stub column..?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
what is the minimum cement content for M20 & M25 as per is code -456(2000).
For the construction project what capital cost has to be taken in consideration?
how many spacers we need for 1 ton reinforcement? aprox.
how we can find sieve #4 is 4.75mm?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
How to calculate plastering for elevated water storage tank
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
pls tell me about method of cutting length of ties column
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.