Answer Posted / arun
efficiency of the transformer is 97 or 98%
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Why synchorised generators are used for the production of electricity?
WHAT IS MEANT BY DERATING OF THYRISTOR?
In HI POT test what is reason for applying the AC VOLTS and DC VOLTS in different applications what is the nessesity for this ?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
What is the difference between DOL starter and star delta starter
How to calculate Ith (I thermal) for curent transformer
HOW TO CALLICULATE RESITENCE,REACTANCE AND IMPEDENCE VOLTGE OF TRANSFORMER 13.33 KVA 144/240 VOLTS 93/56 A WITH FORMULA
Define corner frequency?
CAN U PLEASE TELL ME SOME G.D TOPICS FOR APGENCO INTERVIEW&G.D
what's the difference between abs/inc encoders. apart from the position remembrance what are all the other differences. and what's mean by grey code.
how the inner and outer body is separated in aircrafts?
hi pal, i am vengatesh from tamilnadu(chidambaram),i have called for the written test for the post of jr executive(ELECTRICAL) of AAI ,I dont know about the question paper pattern,so any kindly help me to face the examination,post me the model question papers and some tips to write my examination to (vengi.annadurai@gmail.com)
As a electrical engineer.. what are the basic norms should follow in transformer oil testing.. 1.What is the Electrode type? 2.How long time you will give for oil testing?
How grounding is different than earthings?
what are the steps involved in generator load test?