How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm

Answer Posted / mandeep thakur

By this Formula we can Work out roughly, But Not 100%
Correct
0.3*28.8/sum of Ratio e.g(1:4 is equal 1+4=5
than .3*28.8/5 Only For brick Work.

Is This Answer Correct ?    9 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is .Dwg?

863


Wat is meant by Aecron brick?

1650


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

654


What is the primary difference between adsorption and absorption?

728


For what purpose bedding is used under storm water drains?

666






how pumping of concrete effects the quantity of material used in it?

1295


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

1172


What are the techniques to measure road difference?

760


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

1589


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

1682


In jack arch floor, the rise is kept?

712


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1808


What are the advantages of cad software?

659


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

1688


How to find out slope footing concrete

2430