Answer Posted / srinu.s
BOQ
s.no description of work l b h no qty unit rate totalamount
1 soilexcavation 5 5 5 1 625 m3 200 12500
Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
What year was the keystone power plant in Indiana County constructed?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
What Are The Different Type Of Slump Test Indications?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
pls mail some more tecnical qustions at msaranya2610@gmail.com
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
Define What is the meaning of a blue land surveyors flag?
how we calculate the grade of the Bituminous materials.?????
What is need for setting limits?
how to stop beam concrete between column
Is it possible to make a feature using an overdefined sketch?
what do you know that m20,m25