what is the function of Choke?

Answer Posted / subash nayak

choke is a high inductive device and does not allowed sudden
change of current , if it happens then a high voltage
induced as per the equation- V= L di/dt. Starter helps to
break the circuit as initially current flows , from supply
to choke,tube light one coil, starter, tube light other coil
then back to supply. when starter opens the circuit the
induced voltage across the tube light is sufficient to
ionise the fluorescent material inside the tube light and
the current path made through it. and tube light glows.

Is This Answer Correct ?    23 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If we have use two power cable for incomer, that time how many use cbct for earth leakage protection? 1 or 2 if 1 way? If 2 way?

1649


Why colled 440V to 3-phase supply.

1685


what happen if field of dc shunt motor opens? what is function of putting res. in parallel to one phase of 3 phase IM? the power supplied by 5A source in circuit is given by------Watt.

1556


what happen when power factor of 2 parallely operated transformer become equle?

1715


how to discharge 3 phase power factor correction capacitors

1970






what is fault level of power system ?

5109


Define average demand?

911


How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?

1765


what is the correct format to create a resume for interview??

1517


how does directional relay work incase of ac ?

1034


Hello Friends, How can we recognize the CT Star Point is S1 or S2 in case of Electro Mechanical Relays and what is meant by Restraining coil in relays and what is the purpose of that.. thank you in advance..

1681


I AM A ELECTRICAL PANEL BOARD DESIGN ENGINEER.IF I GO ANY INTERVIEW ,TECHNICALLY WHAT ARE QUESTIONS I WILL FACE FROM INTERVIEWER?

12308


How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer

1313


how to changeover ups in this power failur time?

1535


why it is not advisable to run low rating (19KVA) DG sets in parallel for long durations even though they are provided with droop ckts (QDC)

1478