why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
Answer Posted / suresh.s
the cement strength also prepared for 28 days
Is This Answer Correct ? | 2 Yes | 10 No |
Post New Answer View All Answers
how many kg of 20mm, 10mm, dust available in one ton stone boulder
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is the cemnent ratio
why do we provide haunches in rcc box or underpasses?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
significance of specific surface area of particles?
what is moment-curvature relationship in semi rigid connections??
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
what is grade intersection?
What are the steps involved in the concreting process?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
calculate the quantity of water for 1:6 cement mortar
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE