why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..

Answer Posted / suresh.s

the cement strength also prepared for 28 days

Is This Answer Correct ?    2 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many kg of 20mm, 10mm, dust available in one ton stone boulder

1430


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1383


What is the cemnent ratio

1827


why do we provide haunches in rcc box or underpasses?

2479


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)

2037






Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

1649


significance of specific surface area of particles?

1640


what is moment-curvature relationship in semi rigid connections??

1661


Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.

1260


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

1321


what is grade intersection?

1607


What are the steps involved in the concreting process?

872


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1594


calculate the quantity of water for 1:6 cement mortar

1649


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

3599